Re: Next generation COBOL?



> Richard - just a thought - delivery scheduling - ring any bells with you
> as regards ICL ?

I don't recall any products. But I do know that NZ Rail tried a
scheduling system in the late 70s/early 80s. Every wagon had a
'barcode' in steel which was read by scanners at the trackside of
several yards. Thus, of an evening, they knew the location of every
wagon and where it was to go based on the manifests. Their IBM 360/157
was fired up to calculate the shunting instructions to make up the
trains due to leave at 8 am and by lunch time the results started to be
printed out.

Oops.

.



Relevant Pages

  • Re: What Really happened to Steam?
    ... Has anyone written about the experience of cutting a steam loco up? ... Finally cut the wheels off the axles, load the lot into a wagon and ... accidents suffered loading the wagons than in the cutting up. ... This address not read, substitute trains for rail ...
    (uk.railway)
  • Re: BBC - The train youve been waiting for
    ... Its also not at all unusual for rail vehicles to be moved by road, ... if the vehicle is unable to travel by rail due to its condition. ... The Italians had some trailers which could take a 4-axle wagon. ...
    (uk.railway)